Showing posts with label Flooring. Show all posts
Showing posts with label Flooring. Show all posts

Saturday, April 2, 2011

CDR Status Update

Last weekend we returned to the CDR after some of the snow melted. No getting stuck in the driveway this time, although now we've got mud.

The focus of the weekend was to continue the flooring installation. It was a good feeling when we left on Sunday to have the dining room completed. All that is left is part of the kitchen floor and to install the transition strips.

Dining Room Flooring

Next up, installation of the interior doors and finally the baseboard and door trim. Then we can call the house complete!

Monday, November 29, 2010

Construction Update - Walking the Planks

We got quite a bit done on the flooring last week although we didn't get it finished (no thanks to freezing pipes among other issues).

I am liking the pine laminate look. It's not real pine, but when on the budget building method, it gets the job done. And still looks rustic enough for a cabin-y look. The planks snap together and aside from a few cutting errors, we are working our way from one side of the house to the other.

Bill & Karl at the Starting Point
Bill Working on Living Room Floor
Guest Bedroom Done
Looking Down the Completed Hallway into the Master Bedroom
We still need to finish the dining room and kitchen and then we'll be ready to order and hang our interior doors. No more curtain for a bathroom "door". Hooray!